ASME PTC 4-1
Jadwal Pelatihan ASME PTC 4-1
| Tanggal | Tempat | Kota |
|---|---|---|
| Belum ada jadwal terbaru |
DESKRIPSI
Performance of the boiler, like efficiency and evaporation ratio reduces with time, due to poor combustion, heat transfer fouling and poor operation and maintenance. Deterioration of fuel quality and water quality also leads to poor performance of boiler. Efficiency test-ing helps us to find out how far the boiler efficiency drifts away from the best efficiency. Any observed abnormal deviations could therefore be investigated to pinpoint the problem area for necessary corrective action. Hence it is necessary to find out the current level of efficiency for performance evaluation, which is a pre requisite for
energy conservation action in industry.
TUJUAN
- Understanding of object & scope of PTC 4 – 1
- Understanding of definition and description that used on PTC 4 – 1
- Understanding steam generator performance test principle
- Familiar with test instrumentation
- Understanding of measurement methods
- Understanding steam generator performance calculation
- Know how to report of test result
MATERI
- Introduction
- Object & scope of PTC 4 – 1
- Definition and description term
- Performance test principle
- Instrumentation
- Measurement methods
- Performance calculation
- Report of test result
METODE PELATIHAN
Pre test
Presentation
Discussion
Case Study
Post test
Evaluation
FASILITAS
Training Kit
Hand out
Certificate
Lunch + 2x Coffee Break
Souvenir
Form Pre-Registrasi
Data Materi Training | |
| Topik Training | : ASME PTC 4-1 |
| Link | |
| *Jumlah Peserta | Estimasi Jumlah Peserta yang di ajukan |
| *Nama Peserta Yang Didaftarkan | |
Personal Data | |
| *Nama | |
| *Jabatan | Jabatan/Divisi/Departement |
| *Nama Perusahaan | |
| *Alamat Perusahaan | |
| *Email Perusahaan | |
| *Email Alternatif | eg: gmail, yahoo, hotmail |
| *Telepon Kantor | |
| Ekstensi | |
| *Handphone | |
| * Harus di isi | |
![]() | |
